新闻中心
Home > News Center
  • What power rating is available?

    2026-09-24 11:10:59
    The charger is available in 60KW, 80KW, 120KW, 160KW, 240KW and 360KW models.
  • Do you test all chargers before shipping?

    2026-09-24 11:10:59
    Yes, we test the products before shipping and provide a factory test report along with the goods. We also provide an electronic version.
  • High-Efficiency Transformer Technology for Renewable Energy Systems

    2026-09-24 11:10:58
    High-efficiency transformers play a critical role in renewable energy systems by improving power conversion efficiency, reducing electrical losses, and supporting stable grid integration. This article analyzes transformer technologies used in solar and wind power applications, including advanced core materials, loss optimization methods, thermal management, and smart monitoring systems. Engineers can use these principles to evaluate transformer reliability and efficiency for modern renewable energy infrastructure.
  • Transformer Explained: Key Types, Uses, and Performance Factors You Should Know

    2026-09-24 11:10:58
    Transformer: 7 Critical Things Every Buyer Must Know Before Choosing One Transformer selection is never just a catalog decision. In my factory audits and project reviews, the biggest losses come from wrong voltage matching, under-specified insulation class, poor thermal design, and supplier claims...
  • Are S9 transformers suitable for compliant new construction projects?

    2026-09-24 11:10:57
    The S9 series transformers are mainly suitable for markets with low energy efficiency. The loss index of the S9 does not meet the current energy efficiency requirements, and its long-term operation has high energy consumption. The total cost of electricity over its entire life cycle is much higher t...
  • Can this device be installed as a handcart-type device?

    2026-09-24 11:10:57
    Yes, it can be a pull-out device with a dedicated push-frame.
  • What is your delivery cycle?

    2026-09-24 11:10:57
    Delivery time depends on the quantity ordered, and is usually within 7 to 30 days after receiving payment.
  • Transformer Thermal Management and Cooling System Engineering

    2026-09-24 11:10:48
    Transformer thermal management is essential for maintaining reliability and extending equipment service life. This article explains transformer heat generation mechanisms, cooling system engineering, ONAN, ONAF, OFAF, and ODWF cooling methods, thermal simulation, hot spot temperature control, and failure prevention strategies. Engineers can understand how optimized cooling structures improve transformer performance in power grids, renewable energy systems, industrial facilities, and large electrical infrastructure.
  • Do you test the products before shipping?

    2026-09-24 11:10:48
    Yes, we test the products before shipping and provide a factory test report along with the goods. An electronic version of the test report can also be provided.
  • Transformer Guide: How to Select the Right Transformer for Maximum Efficiency

    2026-09-24 11:10:48
    Transformer: 7 Critical Things Every Buyer Must Know Before Choosing One When a transformer fails, the bill is rarely limited to the unit itself. I have seen one overheating issue stop an entire production line, trigger emergency load transfers, and create a chain of penalties tied to downtime, mi...
  • Do you test all products before shipping?

    2026-09-24 11:10:47
    Yes, we test the products before shipping and provide a factory test report with the shipment. We also provide an electronic version of the test report.
  • Can you help with power system design?

    2026-09-24 11:10:47
    Yes, we can have our engineering team provide complete power system design and technical support based on your requirements, information, and drawings.
  • How does this product ensure its waterproof performance?

    2026-09-24 11:10:47
    Hot melt adhesive on the inner wall firmly bonds the cables together, providing a sealed protection.
  • What is the main function of the outer layer?

    2026-09-24 11:10:47
    The radiation-crosslinked polyolefin outer layer provides electrical insulation protection.
  • Is this product suitable for harsh environments?

    2026-09-24 11:10:46
    Yes, it has excellent resistance to flooding, pollution, condensation, and corrosion.
  • What voltage ranges are supported?

    2026-09-24 11:10:40
    They are suitable for power supplies with rated voltages from 450/750V to 26/35kV.
  • What products do you offer?

    2026-09-24 11:10:39
    We provide medium and low voltage equipment, switchgear, transformers, substations, distribution cabinets, busbars, and complete power distribution solutions.
  • Is the operating mechanism modular or spring-loaded?

    2026-09-24 11:10:39
    The operating mechanism can be modular or spring-loaded.
Altogether 53 article, Every page shows:18 article

About Us

JiHui Electric Group Co., Ltd , high-end website construction, foreign trade website construction, marketing website construction, website optimization, development websites, corporate network marketing, search engine promotion, wechat mini program, corporate mailbox, short video operation, etc.

Contact Us

No. 161 Jingliu Road, Yueqing Economic Development Zone, Yueqing City, Zhejiang Province, China

jh.power@jihuielec.com

+86 18967711755

Follow Us

Copyright ©  JiHui Electric Group Co., Ltd   All rights reserved  

Sitemap

This website uses cookies to ensure you get the best experience on our website.

Accept Reject